PLEASE NOTE: NO PHYSICAL PRODUCT WILL BE SHIPPED, THIS PRODUCT IS A DOWNLOADABLE PDF
Catholic Saint trading cards for April Saints (Set #1) are the perfect downloadable, printable cards for Catholic school students or homeschoolers to study and learn facts about the Saints. The PDF includes 4 pages of trading cards with a total of 8 different Saint cards. They double as small greeting cards for baptisms or confirmations—after trimming they can fold to fit into a 4 Bar envelope (not included), blank inside for personal greetings. For trading cards, they can be folded and easily glued together to create a double-sided card.
BONUS!! Receive 8 coloring pages for all the Saints in this set—$8.00 value!
Saints included in this set:
• St. Isidore of Seville
• St. Bernadette Soubirous
• St. George
• St. Mark
• St. Louis de Montfort
• St. Gianna Beretta Molla
• St. Catherine of Siena
• St. Gemma Galgani
This will be an ongoing product as I illustrate Saints along with the Liturgical calendar. Please message me if you want to request specific Saints to be added to my list!
PLEASE NOTE: THIS ITEM IS AN INSTANT DOWNLOADABLE DIGITAL FILE. FOR BEST RESULTS, PLEASE USE ADOBE ACROBAT READER OR ACROBAT ON A LAPTOP OR DESKTOP COMPUTER RATHER THAN A MOBILE DEVICE OR TABLET TO OPEN AND PRINT THE FILE.
• • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • •
► WHAT YOU GET
After purchase, you will receive one PRINTABLE PDF digital file.
• PDF size: 8.5" x 11" with (2) trading cards per page
• File includes fold and trim lines as guides, each page should be scored and folded in half and then trimmed along the guidelines. Trimmed and folded cards measure 4.5" high x 3.25" wide.
• BONUS PDF with black and white coloring pages for all Saints in this set!
A detailed video tutorial is in my Instagram highlights @catholicpapergoods https://www.instagram.com/catholicpapergoods/
• • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • •
► WHAT YOU'LL NEED
• Color printer. You can print these from your own printer or have them printed and trimmed for you at FedEx Office®, Staples®. Office Max®, Office Depot® or any other professional print shop that accepts press quality PDF files. The colors you see on your computer screen may print differently on paper. Test print one page first.
• Heavy paper or card stock for the best print quality (80lb+), something like this: https://amzn.to/32oWwMl OR this: https://amzn.to/2hqyaws
• If you want to use them as cards, they fit into 4 Bar envelopes like this: https://amzn.to/32nPUhj
• Scissors, craft knife or paper cutter to trim
• Bone folder to score and fold the cards like this: https://amzn.to/2OYYEqq or just use a butter knife from your kitchen
• To make trading cards, a spray adhesive like Super 77 https://amzn.to/2MNHxFn or a Xyron Create-a-Sticker machine https://amzn.to/32kx2jn are excellent adhesive options. You can also laminate them after they're trimmed if you want.
• A TEST PRINT AND PROOF ARE HIGHLY RECOMMENDED!!!
• • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • •
► DIGITAL FILE AND IMAGE
PLEASE NOTE: Every computer monitor and printer is color calibrated differently resulting in slight variations from what appears on the screen. Paper color and stock may also affect the final printed color. Catholic Paper Goods is not responsible for print errors or color shifts.
• • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • •
► TERMS OF USE
All purchased files and designs are available for PERSONAL (non-commercial) USE ONLY. Selling, sharing, reproducing, re-distributing and/or commercial use of this file (both electronically and printed) by Catholic Paper Goods / Shari Lerner Van Vranken is strictly prohibited.
• • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • •
► INSTANT DOWNLOAD INSTRUCTIONS
If you have an Etsy account, after your purchase you’ll see a View your files link which goes to the Downloads page. Here, you can download all the files associated with your order.
Downloads are available once your payment is confirmed. If you paid with PayPal or a credit card on Etsy, confirmation might take a few minutes. You will receive a download notification email from Etsy.
If you're unsure if you've purchased a digital Item, you can always go back to the listing page. If it is a digital download, you should see an "Instant Download" message on the images for the item.
Please note that you can't download a digital purchase through the Etsy app at this time. To download a digital file, please sign in to Etsy on your mobile browser or a non-mobile computer.
If you need to download your orders again, they can be found under: > Your Account > Purchases & Reviews > Download Files
Files should only be downloaded on a computer or laptop. The link may not work if you attempt to open it on a smartphone or tablet. If you are having trouble, a tutorial on downloading digital files is available at www.etsy.com/help/article/3949
• • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • •
©2020 Catholic Paper Goods
Your files will be available to download once payment is confirmed.
But please contact me if you have problems with your order
Because of the nature of these items, unless they arrive damaged or defective, I can't accept returns for:
Buyers are responsible for return shipping costs. If the item is not returned in its original condition, the buyer is responsible for any loss in value.
Nov 24, 2025
These cards are great! Seller was great to work with too!
Nov 24, 2023
So much hard work has gone into making these beautiful products!
Aug 5, 2023
These cards are great! Very good quality and nicely done!
Jun 20, 2023
Good quality download, matched description
Mar 11, 2022
LOVE this shop!! I use her materials all the time in my classroom.